Construction specification

NO.Species.Weight(kg/cartons)
Alarge cartons.Area:1m2/cartons 46kg±2
ACCorners available in large cartons.Highly:240cm/cartons 46kg±2
Bmedium cartonsArea:1m2/cartons36kg±2
BCCorners available in medium cartons.Highly:240cm/cartons34kg±2
Esmall cartons.Area:1m2/cartons18kg±1
NO.Species.Weight(kg/cartons)
ECCorners available in small cartons.Highly:200cm/cartons15kg±1
ARlarge cartons.Area:0.7m2/cartons42kg±2
ARCCorners available in large cartons.Highly:240cm/cartons40kg±2
BBRmedium cartonsArea:1m2/cartons36kg±2
BRCCorners available in medium cartons.Highly:216cm/cartons34kg±2
NO.Species.Weight(kg/cartons)
Alarge cartons.Area:1m2/cartons 46kg±2
ACCorners available in large cartons.Highly:240cm/cartons 46kg±2
Bmedium cartonsArea:1m2/cartons36kg±2
BCCorners available in medium cartons.Highly:240cm/cartons34kg±2
Esmall cartons.Area:1m2/cartons18kg±1
ECCorners available in small cartons.Highly:200cm/cartons15kg±1
ARlarge cartons.Area:0.7m2/cartons42kg±2
ARCCorners available in large cartons.Highly:240cm/cartons40kg±2
BBRmedium cartonsArea:1m2/cartons36kg±2
BRCCorners available in medium cartons.Highly:216cm/cartons34kg±2

Step 01.

After surface preparation is done to the existing or new wall, spread entire back of the stone with cement mortar or cement based tile adhesive. Mortar or cement based tile adhesive.

Step 02.

Press each stone firmly onto the mortar bed, ensuring that individual stones are placed closely together, creating uniform joints between them.

Step 03.

Using a grout bag, fill up the joints with grout.

Step 04.

When grout is firm, touch up with a wooden stick or metal jointing tool to rake out excess grout. Use dry bristle brush to remove loose grout and clean surface of stone.